Miele DO 7860 Operating And Installation Instructions page 64

Dialog oven
Table of Contents

Advertisement

Functions using moisture
Preparing and starting the water
intake process
 Fill a suitable container with the
required amount of fresh tap water.
 Open the door.
 Pull the water intake pipe forwards
(located below the control panel on
the left).
 Immerse the end of the water intake
pipe in the container with tap water.
 Confirm with OK.
The water intake process will begin.
The amount of water actually drawn up
into the oven may be less than the
amount specified as required, leaving a
small amount in the container.
The intake process can be interrupted
and restarted at any time by selecting
Stop
or
Start
.
 Remove the water container after the
water intake process and close the
door.
64
The message stating that the intake
process is finished will go out.
The sound of the pump running can be
heard again briefly. Residual water in
the water intake pipe is being drawn
into the oven.
The oven heating and cooling fan will
switch on. The required and the actual
temperature will appear.
You will see the temperature rising in
the display. A buzzer will sound when
the selected temperature is reached for
the first time.
If you have selected
you can alter the time before any
steam is released by selecting
Time-controlled
,
Change
.

Advertisement

Table of Contents
loading

Table of Contents