GBC AdvancedPunch Pro Service Manual page 83

Hide thumbs Also See for AdvancedPunch Pro:
Table of Contents

Advertisement

4. Do GP 6.27 Die Lock Mechanism and Die Rail Springs
Inspection.
This clears the fault
Yes- Return to normal operation; No- Go to Step 5
5. Do GP 6.24 Punch Clutch Inspection and Cleaning.
This clears the fault
Yes- Return to normal operation; No- Go to Step 6
6. Check if the set screws in the pulley of Aligner stepper motor
are secure (PL 5.2). This can be checked by holding down the
Alignment stepper pulley and trying to move the Aligner
carriage on its rails. There should not be any play in the
mechanism.
The set screws are secured tightly.
Yes- Go to Step 7;
No- Tighten set screw(s) and return to normal operation
GBC AdvancedPunch Pro
7. There are three more pulleys involved in the Aligner drive (PL
5.3).
Driven pulley of the Alignment Stepper motor
Pulley adjacent to the driven pulley
Pulley on the other shaft of the Aligner drive.
Make sure all the set screws in these three pulleys are
tightened securely. If the pulley uses a coiled spring pin, make
sure the spring is not broken.
The set screws are secured tightly.
Yes- Escalate to 2
nd
No- Tighten set screw(s) and return to normal operation
11/07/2018
3-7
Pulley adjacent to the
driven pulley
Driven pulley of the
Alignment stepper
motor
Pulley on the other
shaft of the Aligner
drive
level
Punch Quality

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents