GBC AdvancedPunch Pro Service Manual page 115

Hide thumbs Also See for AdvancedPunch Pro:
Table of Contents

Advertisement

12. Remove the E-Ring from the top of the Idler Panel Shaft.
E-Ring
13. Open the Entrance Idler Panel from the front side.
14. Carefully remove the Shaft.
(Cont.)
GBC AdvancedPunch Pro
Shaft
15. Grasp the Entrance Idler Panel and remove it.
16. Do the following to transfer the Sensors, Solenoid Modules, Idler
Rollers, Springs, and Panel Magents to the new weldment.
REP 2.12
Idler Roller replacement
REP 2.25.3
Paper path sensor (S2, S3, S4) Replacement
REP 2.28.2
Disengaging Roller Solenoid Replacement
Installation Procedure
1. Place the Entrance Idler Panel in position.
2. Insert the Shaft through the holes (2) at the left side of the Entrance
Idler Panel.
3. Install the E-Rings (2) at the top and bottom of the Shaft.
4. Connect the Connectors for Solenoids SOL3 & SOL4 to the header.
5. Connect the Connectors for Sensors S2, S3, S4 and S1b.
6. Place the sensor cables into the Cable Clamps, and close the
Clamps.
7. Install the Ground strap.
8. Do ADJ 1.7 Idler Panel Magnetic Latches Adjustment.
9. Do REP 1.18 to install the Docking Bracket.
10. Do REP 1.8 to install the Side Cover.
11. Do GP 6.3 Dock the Punch to connect the Punch to the upstream
and downstream devices.
12. Close the Front Door.
13. Connect the Power Cord.
14. Power ON the entire printing system.
08/20/2015
4-27
Repairs/Adjustments

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents