List Of Phase Displays - Siemens LMV27.100x2 Basic Documentation

Basic unit with integrated air-fuel ratio control for forced draft burners
Table of Contents

Advertisement

22.1.2.3. List of phase displays

Phase
Function
Ph00
Lockout phase
Ph01
Safety phase
Ph10
Home run
Ph12
Standby (stationary)
Ph22
Fan ramp up time (fan motor = ON, safety valve = ON)
Ph24
Traveling to the prepurge position
Ph30
Prepurge time
Ph35
Run the fan to ignition speed
Ph36
Traveling to the ignition position
Ph38
Preignition time
Ph39
Valve proving filling time
(test pressure-switch-min when mounted between fuel valve V1 and fuel valve V2)
Ph40
1st safety time (ignition transformer ON)
Ph42
1st safety time (ignition transformer OFF),
Ph44
Interval 1
Ph50
2nd safety time
Ph52
Interval 2
Ph60
Operation 1 (stationary)
Ph62
Maximum time low-fire (operation 2, preparing for shutdown, traveling to low-fire)
Ph70
Afterburn time
Ph71
Run the fan to postpurge speed
Ph72
Traveling to the postpurge position
Ph74
Postpurge time (no extraneous light test)
Ph78
Postpurge time (abortion when load controller ON)
Ph79
Run the fan to standby speed
Ph80
Valve proving - test space evacuating
Ph81
Valve proving - test time atmospheric pressure
Ph82
Valve proving - test space filling
Ph83
Valve proving - test time gas pressure
Ph90
Gas shortage waiting time
128/219
Building Technologies
Basic Documentation LMV27...
22 Operation of LMV27 via the AZL2
CC1P7541en
17.12.2018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents