Figure 11-4 MPO connector
Figure 11-5 SC/PC connector
Step 4 Remove the optical module and cover the bores with dust plugs. Store optical module safely.
The latch varies on different optical modules.
clasp latch. To release the clasp latch, rotate it down.
with a tab latch. The tab latch is released when you pull it.
Figure 11-6 Optical module with a clasp latch
Figure 11-7 Optical module with a tab latch
Issue 13 (2017-11-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 11-6
shows an optical module with a
Figure 11-7
shows an optical module