Huawei S2700 Hardware Installation And Maintenance Manual page 153

Hide thumbs Also See for S2700:
Table of Contents

Advertisement

S2700&S3700&S5700&S6700 Switch
Hardware Installation and Maintenance Guide
Item
Load-bearing
capacity
Door and
windows
Wall surface
treatment
Cable trays
Water pipe
Internal
partition wall
Installation
position of the
air conditioner
Other
requirements
Figure 13-80 Internal partition wall inside the equipment room
Issue 13 (2017-11-20)
Requirements
The floor must bear loads larger than 150 kg/m
The door of the equipment room should be 2 m (6.56 ft) high and 1 m
(3.28 ft) wide. One door is enough. Seal the doors and windows with
dustproof plastic tape. Use double-pane glass in the windows and seal
them tightly.
Paste wallpaper on the wall or apply flat paint. Do not use pulverized
paint.
Use cable trays to arrange cables. The inner faces of the cable trays must
be smooth. The reserved length and width of the cable trays, and the
number, position and dimensions of the holes must comply with the
requirements of device arrangement.
Do not pass service pipes, drainpipes, and storm sewers through the
equipment room. Do not place a fire hydrant in the equipment room, but
place it in the corridor or near the staircase.
Separate the area where the equipment is installed from the equipment
room door. The partition wall can block some outside dust.
Install air conditioner vents so that the air does not blow directly on
equipment.
Avoid the proliferation of mildew, and keep out rodents (like mice).
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Appendix
2
2
(0.21 bf/in.
).
145

Advertisement

Table of Contents
loading

This manual is also suitable for:

S3700S5700S6700

Table of Contents