Rtlf Datum Clamp; Rtlf End Covers - Renishaw ATOM Series Installation Manual

Linear encoder systems
Table of Contents

Advertisement

RTLF / RKLF tape scale
(continued)

RTLF datum clamp

The datum clamp fixes the RTLF scale rigidly to the substrate at the location chosen.
CAUTION: The metrology of the system may be compromised if the datum clamp is not used.
It can be positioned anywhere along the axis depending upon the customers' requirements.
1.
Remove the backing paper from the datum clamp.
Place the datum clamp with cut-out against the scale
at the chosen location.
2.
Place a small amount of adhesive (Loctite
in the cut-out on the datum clamp, ensuring none
of the adhesive wicks onto the scale surface.
ATOM linear installation guide
®
435
)
Ensure the adhesive wicks along
the entire length of cut-out.

RTLF end covers

The end cover kit is designed to be used with RTLF scale to provide protection for exposed scale ends.
NOTE: End covers are optional and can be fitted before or after readhead installation.
1.
Remove the backing paper from the adhesive tape
on the back of the end cover.
2.
Align the markers on the edges of the end cover with the end
of the scale and place the end cover over the scale.
8
Dimensions in mm
22
*
gap
NOTE: There will be a gap * between the end of the
scale and the adhesive tape on the end cover.
12

Advertisement

Table of Contents
loading

Table of Contents