Renishaw ATOM Series Installation Manual page 20

Linear encoder systems
Table of Contents

Advertisement

System connection
(continued)
Approved ESD precautions must be followed at all times during readhead electrical connection.
NOTE: The FPC cable must be connected before fitting the readhead lid. The lid is secured by the readhead mounting screws.
Inserting the FPC cable
1.
Ensure the locking lever is up (open) before
fully inserting the FPC cable into the connector.
CAUTION: Check correct orientation of cable
before inserting into the connector. Readhead will
be shipped with connector in the open position.
Removing the FPC cable
1.
Placing your finger on the whole of the locking
lever, slowly lift it up and away to disengage the
locking mechanism.
CAUTION: Do not use tools such as screwdrivers
or tweezers to open the locking lever as this may
cause damage to the connector or pcb.
ATOM linear installation guide
2.
Applying pressure to the whole locking lever,
push it down to lock the FPC cable in place.
CAUTION: Do not push the locking lever down if
no FPC cable is inserted as this will damage the
locking mechanism.
2.
Ensure locking lever is fully open before removing
the FPC cable.
3.
When the system has been connected, proceed
with 'Readhead mounting and alignment', page 23
and 'System calibration', page
28.
3.
Pull the FPC cable straight back to remove it.
CAUTION: Do not pull upwards or sideways as
this may damage the readhead.
18

Advertisement

Table of Contents
loading

Table of Contents