RTLF / RKLF tape scale
(continued)
RTLF mounting
(for lengths < 500 mm only)
1.
Thoroughly clean and degrease the substrate using
recommended solvents
('Storage and handling', page
Allow substrate to dry before applying scale.
4.
Support
dowels
Location ledge
ATOM linear installation guide
2.
Remove backing paper from scale.
3).
or
5.
Clean scale using Renishaw scale wipes or
a clean, dry, lint-free cloth.
3.
Locate scale against dowels or ledge
and rotate down onto substrate. *
*
If dowels or ledge are permanent, their maximum
height above substrate is 0.6 mm.
6.
Fit datum clamp and end covers
if needed, deselect reference marks that are not
required as detailed
(page
13).
7.
Remove temporary dowels (if fitted).
(page 12)
and,
9