UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
Step 4 Remove the front door and power modules. Before moving the power modules, rotate the
ready switch to the unlocked
Two persons are required to move a power module. Keep the power units at the same level
during movement.
Remove the ground cable from the front door while removing the front door.
Step 5 Install mounting ears on the chassis, two on the left and two on the right.
Issue 03 (2019-12-13)
Figure 3-17 Installation positions of floating nuts
Copyright © Huawei Technologies Co., Ltd.
state.
3 Installation
55