Juniper MX10003 Quick Start Manual page 23

3d universal edge router
Hide thumbs Also See for MX10003:
Table of Contents

Advertisement

Copyright © 2017, Juniper Networks, Inc.
WARNING:
The intrabuilding port(s) of the router is suitable for connection
to intrabuilding or unexposed wiring or cabling only. The intrabuilding port(s)
of the router MUST NOT be metallically connected to interfaces that connect
to the OSP or its wiring. These interfaces are designed for use as intrabuilding
interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE, Issue
4) and require isolation from the exposed OSP cabling. The addition of primary
protectors is not sufficient protection to connect these interfaces metallically
to OSP wiring.
CAUTION:
Before removing or installing components of a router, attach an
ESD strap to an ESD point, and place the other end of the strap around your
bare wrist. Failure to use an ESD strap could result in damage to the router.
CAUTION:
Use an external surge protective device (SPD) at the AC input of
the router.
Only trained and qualified personnel should install or replace the router.
Perform only the procedures described in this quick start or the MX10003 3D Universal
Edge Router Hardware Guide at
be performed by authorized service personnel only.
Read the installation instructions before you connect the router to a power source.
Before installing the router, read the guidelines for site preparation in the MX10003 3D
Universal Edge Router Hardware Guide at
sure that the site meets power, environmental, and clearance requirements for the
router.
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow at least 6 in. (15.2 cm) of clearance between side-cooled routers.
Allow 2.8 in. (7 cm) between the side of the chassis and any non-heat-producing
surface such as a wall.
When installing the router, do not use a ramp inclined more than 10 degrees.
Manually installing the router requires two people for an empty chassis and three
people for a fully configured router to lift the chassis. Before lifting the chassis with
only two people, remove the components as described in the MX10003 3D Universal
Edge Router Hardware Guide at
keep your back straight and lift with your legs, not your back. Do not attempt to lift the
chassis by the power supply handles.
Mount the router at the bottom of the rack if it is the only unit in the rack.
When mounting the router in a partially filled rack, load the rack from the bottom to
the top with the heaviest component at the bottom of the rack.
http://www.juniper.net/techpubs/
http://www.juniper.net/techpubs/
http://www.juniper.net/techpubs/
Safety Warnings
. Other services should
to make
. To prevent injury,
23

Advertisement

Table of Contents
loading

Table of Contents