Commissioning; Preparations; Visual Inspections - Siemens Set CEM CERT Operating Instructions Manual

Continuous gas analysis
Hide thumbs Also See for Set CEM CERT:
Table of Contents

Advertisement

Commissioning

7.1

Preparations

Harmful gases
Danger to personnel, system and the environment can result from introducing harmful
(corrosive, flammable and/or poisonous) gases into the device. If this should be
required for the measuring task of the device, you must take the following measures:
• Take into account the safety measures according to the German Occupational
• Ensure that the discharged gas is treated according to the applicable local laws.
• Flammable gases must not be introduced into the system.
• Purge the device or the plant with a purging gas (inert gas). The gas displaced by
7.1.1

Visual inspections

The system is safely installed mechanically; there is no risk of injury. All electrical
connections are touch-safe and are marked. A check is also made to determine if
additional warnings need to be incorporated in the documentation.
All surfaces that could become hot are isolated or covered to prevent accidental touch.
NOTICE
Danger of burns
Hot contact surfaces > 55°C are marked with a warning notice. Burns may result if
these surfaces are touched with bare skin.
• Only touch these surfaces when wearing protective gloves.
Set CEM CERT
Operating Instructions, 03/2020, A5E34491309-11
WARNING
Safety Act (Arbeitsschutzgesetz - ArbSchG) or similar international regulations.
These safety measures must be coordinated with a local specialist. In particular, this
includes measures to prevent any potential release of gases from the internal gas
path (containment system) as well as their monitoring and disposal.
purging must be collected using appropriate equipment and disposed of
environmentally-friendly via an exhaust line.
7
33

Advertisement

Table of Contents
loading

Table of Contents