Kessel Ecolift XL Instructions For Installation, Operation And Maintenance page 79

Backwater lifting station
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 45
28
Battery voltage control unit ➞ Section 1.5.2 Voltage
29
Confirm maintenance date / set new date ➞ 2.5 Maintenance completed
30
Operating cycles
Pump 1: ___________
Pump 2: ___________
Actuator valve: __________
Motor: _____________
Details from page 1 and 2 of this record.
Resources used:
Tripod
Material used:
Seal set
System ready for operation and handed over to the customer:
..........................................................................
Factory Customer Service/Technical Expert Stamp
.....................................................................
Signature KESSEL AG/Factory Customer Service
Additional information:
Never carry out maintenance during a backwater phase.
Please note that the flaps must be open after the inspection has been completed.
03/2015
Maintenance
Gas monitor
––––––––––––––––––––
––––––––––––––––––––
..............................................................................................
Town, date
..............................................................................................
Name printed in capital letters/Signature of client
79 / 264

Advertisement

Table of Contents
loading

This manual is also suitable for:

010-694

Table of Contents