3
Installation
Risk caused by toxic and hazardous vapours, gases and substances (e. g. bacteria, viruses). Always have any
necessary work on the backwater lifting station done by specialist staff (see 2.2).
3.1
General points related to installation
The backwater lifting station is installed and put into operation at different times according to the usual
construction phases on a building site.
1. Installation of the system tank (base element of the chamber system) in the inspection chamber.
Connection of wastewater inlet and outlet, as well as connection of the pressure pipe via which the
wastewater is pumped off.
Installation of the chamber system, starting from the system tank. Not described in this manual.
2. Installation of the separately delivered assemblies, starting with chapter 3.2.
3. Installation of the control unit and connection of the electrical components (chapter 3.7).
4. Initial operation (chapter 3.9).
Make sure that the work listed under 1. has been fully completed.
3.2
Installing the wastewater pump(s)
•
Fix the wastewater pump(s) in place using the screws <1>
(tightening torque 7Nm).
The pressure outlet pipe for the SPF 4500 pumps must be a PE
welded pipe which is connected to a Pressure Relief Chamber
03/2015
Installation
57 / 264
Abb. [29]