Dataman 448PRO2AP User Manual page 98

Hide thumbs Also See for 448PRO2AP:
Table of Contents

Advertisement

If user specified log file name has format:
<user_log_file_name>.<log_file_extension>
The name with added date will be:
<user_log_file_name><-yyyy-mmm-dd>.<log_file_extension>
The new part representing of date consists of yyyy - year, mmm - month and dd - day.
Example: User specifies Log file name: c:\logs\myfile.log
The final log file name with added date will look like this (have a date November, 7th, 2006):
c:\logs\myfile-2006-nov-07.log
If do you wish to have log file name without any prefix before date information, you can specify
the log file name as:
<log_file_extension>
Example: User specifies Log file name: c:\logs\.log
The final log file name with added date will look like this (have a date November, 7th, 2006):
c:\logs\2006-nov-07.log
Advanced options about Log file size limit are available too.
 option Use Log file text truncating when file size limit is reached - when checked, the
Log file size limit is on. It means that when Log file size reaches specified value, the part of
text included in Log file will be truncated. When the option is unchecked, the size of Log file
is unlimited, respectively is limited by free disk space only.
 option Maximum Log file size specifies the maximum size of Log file in kB.
 option Amount of truncated text specifies the percentage of Log file text, which will be
truncated after Maximum Log file size is reached. The higher value means more text will be
truncated (removed) from Log file.
The Log file settings can be saved to disk by command Options / Save options.
Job Report
Job Report represents the summary description of operation recently made on device. Job is
associated with project file and it means the operation starting with Load project until loading of
new project or closing program PG4UW.
Job Report contains following information:
 project name
 project date
 Protected mode status
 PG4UW software version
 programmer type and serial number
 start time of executing the Job (it means time when Load project operation was performed)
 end time of executing the Job (time of creating the Job Report)
 device name
 device type
 checksum
 device operation options
 serialization information
 statistics information
- dot is the first in file name
98

Advertisement

Table of Contents
loading

This manual is also suitable for:

48pro2ap

Table of Contents