Initial Set Up; Unpacking - FILTR Revolution User Manual

Air filtration system
Table of Contents

Advertisement

FILTR Revolution

2 Initial Set Up

The Revolution unit has a number of optional accessories. Options include external
components such as the wall mounting hardware, ceiling mounting hardware, and 10"
ducting kit. See Chapter 5 for setup and use of these.
Listed internal components are all shipped installed in the Revolution unit. These
include the Carbon Filter, Sensor Pack, and Ionizer.
The Revolution requires little in the way of set up for initial use.

Unpacking

Upon receipt of the packaged unit, inspect the package for damage. If it is damaged,
notify the shipper immediately.
If the package is not damaged, open in carefully. Be sure to inspect each item as it is
removed for broken parts, scratches, dents, and other damage. Be sure to document
any damage found and inform the shipping company and Lighthouse of any findings.
Take photographs of damage upon initial discovery.
With the top of the package opened, the unit casters will be visible as shown below.
Remove the casters and set them aside for later installation (if desired), then remove
the top shipping foam. This foam extends a short way down the sides of the Revolution
unit to keep the unit firmly secured in the shipping package.
With the upper foam removed, reach down into the box and grasp the handles on the
sides of the unit. Lift up to remove the unit from the shipping package.
248083486-1 R2
Figure 2-1
Operators Manual
9

Advertisement

Table of Contents
loading

Table of Contents