Understanding the Mix Cycle
Mixes with very little fine material where the addition of cement causes clumping or
'balling' of the mix
Some SCC admixes
In these situations the Hydro-Control VI can be configured to calculate an amount of water to
add based on a reading with either just aggregates or aggregates and water added. Once
water has been added to a fixed moisture content it is then optional whether an additional
calculation is made to add the main water or whether a pre-set amount of water, scaled for
changes in the dry weight is added. Calibrating recipes is covered in more detail in Chapter 8
Using Moisture Control.
24
Hydro-Control VI Operators Guide HD0456 Rev 1.7.1
Chapter 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Hydro-Control VI and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents