Recommendations; Tools Needed; Point Of Reference - Raven AutoBoom XRT Installation Manual

For agco rogator
Hide thumbs Also See for AutoBoom XRT:
Table of Contents

Advertisement

C
2
HAPTER

RECOMMENDATIONS

Raven Industries recommends the following before installing or operating the AutoBoom XRT system for the first
time, at the start of the season, or when moving the AutoBoom XRT system to another machine:
• Ensure the hydraulic filters have been recently changed and there are no issues with the hydraulic system (e.g.,
pump issues, faulty hydraulic motors, fine metal deposits in the hydraulic hoses, etc.).
• Operate each of the hydraulic functions (i.e., tilt, fold, center rack, tongue extension, or other hydraulic valve
functions) three times to ensure the existing hydraulic valve is using fresh oil and debris is flushed from the
hydraulic hoses, valves, and filters.
• Upon installation of the AutoBoom XRT system, operate the boom and center rack raise/lower functions
through the manual control functions first before operating them via the AutoBoom XRT controller/field
computer to ensure the hydraulic system has been installed correctly and air is released from the system.
Raven Industries recommends the following when installing the AutoBoom XRT system.
• Use part numbers to identify the parts.
• Do not remove the plastic wrap from a part until it is necessary for installation.
• Do not remove plastic caps from a part until it is necessary for installation.

TOOLS NEEDED

The following tools are recommended for installation of the AutoBoom XRT system:
• Standard-sized wrenches
• Cable ties
• Set of tools

POINT OF REFERENCE

The instructions in this manual assume that you are standing behind the machine, looking toward the cab.