Electrical Installation - Honeywell GasLab Q2 Manual

Gas quality analyzer
Hide thumbs Also See for GasLab Q2:
Table of Contents

Advertisement

5.4.

Electrical installation

Before starting work, make sure that you observe and follow all the information in Chapter
and warning
information. A functioning effective lightning protection must exist at the place of use
and an external switch-off device must be installed near the device by the system operator. Above
all, the following sections are important:
Always observe the general safety rules, especially in potentially explosive atmospheres. Always use
a gas detector when working on the instrument and make sure that the GasLab Q2 is voltage-free
(supply and signals) before any change of the wiring. The local / national installation guidelines (e.g.
EN 60079-14) must be observed for all work. The device must be connected to the equipotential
bonding or earth at the place of use.
The explosion protection is lost if the cable glands are installed incorrectly, the installation
is explosion safety relevant! Make sure that the installation is safe and correct. The
manufacturer therefore only accepts responsibility for cable glands made by him or on his
behalf.
La protection contre les explosions est perdue si les presse-étoupes sont mal
installés, l'installation est importante pour la sécurité contre les explosions ! Veillez à ce
que l'installation soit sûre et correcte. Le fabricant n'assume donc la responsabilité que
pour les presse-étoupes fabriqués par lui ou en son nom.
It is essential that you follow the instructions in the following sections.
Information for general use
Rev. M / 73023639
GASLAB Q2 AFTER DELIVERY AND AT THE PLACE OF USE
2.2 Place of use Environmental conditions and installation
2.7 Electrical safety information and emergency stop
The device is protected against polarity reversal.
The device will not work if the connections have been reversed.
64
2 Safety
GasLab Q2

Advertisement

Table of Contents
loading

Table of Contents