Main areas for the inspection
Check the gas connections using a tightness test with gas detector
(
10.1.10 System tightness
Check the battery capacity*
Check the housing parts
Check the external elements with tools (is everything secure)
Monitor the vent/breather element
Conduct a visual inspection of the connections (electrical/mechanical)
Inspect the interior of the device
Conduct a visual inspection of the cylinder pressure
Conduct a visual inspection of the inlet pressures
Adjust the flow volumes using the rotameter
Conduct a visual inspection of the integrated particle filter in the process gas
pipeline and replace it if necessary (only possible during a service visit).
Check the mechanical strength of the electrical grounding and test it for low
resistance
* If you find during inspections that a replacement is necessary, it must be done as part of a service visit,
see section 
Replacing the consumables *
Particle filter for process gases, depending on impurities, every 1 to 3 years
Sensor block due to ageing of the bulb in the IR sensor, every 3 to 5 years
Lithium cell battery, depending on use, as a precaution every 10 years
* The replacement of the above consumables is only possible during a service visit.
If you operate the device official (fiscal), please also observe the applicable
regulations regarding sealing and closing off the housing before opening it.
Information for general use
Rev. M / 73023639
MAINTENANCE, CLEANING AND REPAIR
test)
10.4 Repair work and Honeywell service work.
If you have any questions, please contact Honeywell.