Graco XM PFP Setup & Operation page 49

Plural-component sprayer
Hide thumbs Also See for XM PFP:
Table of Contents

Advertisement

3. Select
to run pump test.
NOTE: These instructions show running the system
with ratio control by weight, which is standard and
preferred for XM PFP systems. To control ratio by
volume, see Test Screens (page 78).
4. Set metering pump air regulator (CD) pressure to
zero. Verify metering pump air valve (CA) is open
(horizontal). Adjust metering pump air regulator
(CD) pressure to 50 psi (0.35 MPa, 3.5 bar).
CA
5. Dispense fluid A:
a. Close recirculation valves, mix manifold inlet
ball valves, and sampling valves.
b. Tare and place a clean 1 quart (1000 cc)
container under sampling valve A.
3A2776K
CD
ti20111a
c. Press
. Metering pump A light (DK) comes
on.
d. Slowly open sampling valve A until material
begins to dispense. Metering pump stops
automatically; twice during test and again when
dispense completes. Metering pump A light
(DK) turns off, metering pump B light (DK) turns
on.
e. Close sampling valve A (AE).
6. Dispense fluid B as follows:
a. Tare and place a clean 1 quart (1000 cc)
container under sampling valve B.
b. Slowly open and adjust sampling valve B to
achieve desired flow. Metering pump stops
automatically; twice during test and again when
dispense completes. Metering pump B
light (DK) turns off.
c. Close sampling valve B.
7. Weigh the two samples with a gram scale and
record the net weights.
8. Return fluid used in test to corresponding fluid
supply container.
Confirm Pump and Metering Test
The Confirm Pump and Metering Test screen displays
when the pump and metering test completes without
error. The screen displays the target weight of material
dispensed into each beaker from each metering pump.
The weights must be entered in grams to calibrate the
machine.
System Verification
ti20112a
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

24w626262869262945262943

Table of Contents