c. Open the A side mix manifold inlet ball valve.
d. Press
repeatedly to set to
Slowly turn metering pump air regulator (CD)
clockwise to increase air pressure until metering
pump A starts. Continue until clean material
dispenses from the A material line then press
to stop pump.
e. Close the A side mix manifold inlet ball valve
then reconnect to the mix manifold. Back out
the metering pump air regulator.
3A2776K
f.
NOTE: Now all of the material lines are primed except
Press
.
for the section from the mix manifold to the gun.
.
25. Perform the Prime Flush Pump procedure on
page 36 to flush out the oil from those lines, and to
finish preparing for spraying.
Repeat for the B material line.
Initial Startup