Use the following procedure to install the DeviceMaster 4-port.
1. Optionally, attach the mounting brackets using the screws provided in the kit
(6-32 1/4" flathead machine) or place the DeviceMaster on a stable surface.
Failure to use the correct screws can damage the PCB and void the
warranty. Do NOT use screws that exceed the length of the screws
provided with the mounting bracket kit.
Note: If you ordered the DeviceMaster Rackmount Shelf Kit accessory, use the
document that accompanied that kit or
mount the DeviceMaster on the shelf.
2. Connect the DeviceMaster to the same Ethernet network segment as the PLC.
If the DeviceMaster serial number is below xxxx-030000 use one of the
following methods to connect the cable. Serial numbers above xxxx-030000,
the Ethernet port are interchangeable.
Ethernet hub or switch (10/100Base-T): Connect to the port labeled UP
on the DeviceMaster using a standard Ethernet cable.
Server NIC (10/100Base-T): Connect to the port labeled DOWN on the
DeviceMaster using a standard Ethernet cable.
Daisy-chaining DeviceMaster units: Connect the port labeled DOWN on
the first DeviceMaster to the port labeled UP on the second DeviceMaster
or other device using a standard Ethernet cable. Refer to
DeviceMaster 4-Port Units
Note: Do not connect multiple units until you have changed the default IP
address, see
Preparing the DeviceMaster for Configuration
3. Apply power to the DeviceMaster by connecting the AC power adapter to the
DeviceMaster, the appropriate power cord for your location to the power
adapter, and plugging the power cord into a power source. If you want to
provide a power supply, see
4. Verify that the PWR LED has completed the boot cycle and the network
connection for the DeviceMaster is functioning properly.
LED on the front panel of the DeviceMaster is lit, indicating you have
power and it has completed the boot cycle.
Note: The PWR LED flashes while booting and it takes approximately
PWR
15 seconds for the Bootloader to complete the cycle. When the
Bootloader completes the cycle, the LED has a solid, steady light
that blinks approximately every 10 seconds.
LNK
The red LNK ACT LED is lit, indicating that
you have a working Ethernet connection.
ACT
If the red COL LED is lit, there is a network
COL
collision.
If the red 100 LED is lit, it indicates a
working 100 MB Ethernet connection (100
100
MB network, only). If the LED is not lit, it
indicates a 10 MB Ethernet connection.
Note: For additional LED information, go to the
DeviceMaster MOD | UP Hardware Installation and Configuration Guide: 2000630 Rev. B
on Page 88.
4-Port Panel Mount Power Supply
4-Port LED Descriptions
download the document
Daisy-Chaining
on Page 31
on Page 84.
10/100 NETWORK
LNK
ACT
COL
100
UP
Status LED table
on Page 86.
to
DOWN

Advertisement

Table of Contents
loading

Table of Contents