Once choose the function that to perform and click on "Execute" Note: UPS must supports
those function to perform it
Test Control
•
•
Turn-Off Parameters
•
•
Test Period
•
•
•
•
8.5.3.3
To configure SNMP of its NetAgent UPS
Issued by: BT
Version no: 6.1
Date: March 2019
UPS Self Test: Execute UPS Self Test
UPS Calibration Test: Execute UPS Calibration Test
Turn-Off Delay: To set the buffering time for UPS before shutdown
Sleep Time: To set UPS sleep time.
Unknown: This defined by UPS configuration.
Two weeks: Perform UPS test every two weeks
Weekly: Perform UPS test every week
Disable: Do not perform UPS test
UPS Management
BT UPS Enterprise SNMP Agent
Page 89 of 103