Installation; General Installation Information - Kessel Aqualift S XL Instructions For Installation, Operation And Maintenance

Pumping station, wet installation, with one-handed closures
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
4

Installation

1
4.1

General installation information

A residual current circuit breaker must be provided as electrical protection for the pumping station.
The pumping station's control unit should be positioned to prevent any unauthorised use. Consequential
damage can occur in the building if the pumping station is switched off accidentally.
The pumping station is installed and put into operation at different times according to the usual construction phases on
a building site. A practical order is:
1. Installation of the technical module.
2. Connection of wastewater inlet and the pressure pipe via which the wastewater is pumped out.
3. Installation of the chamber module (not described in these instructions).
4. Installation of reserve conduit, ventilation, control unit and electrical connection.
5. Putting into operation
2019/12
Installation
2
3
Ill. [8]
4
37 / 148
Aqualift Comfort
Aqualift Comfort
5
010-993

Advertisement

Table of Contents
loading

Table of Contents