Polycom SpectraLink 6000 System Facility Preparation page 34

Hide thumbs Also See for SpectraLink 6000 System:
Table of Contents

Advertisement

SpectraLink 6100 MCU: Facility Preparation: SpectraLink 6000 System
34
Day two
The Polycom field service engineer will assist with training of the
end-user and verify that all questions are answered. Our engineer will
usually be on-site from 9 a.m. to 3 p.m. Activities will include the
following:
1. Assist with handout and training of handset users.
2. Stay on-site for a couple hours to answer any questions from users
and/or administrator.
3. Have customer contact or system administrator sign the
installation acceptance document.
PN: 1725-36096-001_J.doc

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SpectraLink 6000 System and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents