Terminate Cable at Base Station Locations
PN: 1725-36096-001_J.doc
After running the wire to the Base Station location, terminate the wire
using an RJ-45 modular crimp-on plug. Connect the data pair to pins
1 and 2 and the power pair to pins 7 and 8.
If the connection uses more than two pair, refer to the table on the
following page.
To avoid damage to the connectors or crimps, be sure to run the
wire to the Base Station before connecting the RJ-45 connectors.
RJ-45 Modular Cable
When wiring the 8-pin connector, use the following table as a guide.
8-pin Modular
MCU Pin
Connector
Function
1
2
3
Power 3
4
Power 2
5
Power 2
6
Power 3
7
Power 1
8
Power 1
Polarity
Data 1
Any
Data 2
Any
+
-
+
-
-
+
Run Cable for System
19
Need help?
Do you have a question about the SpectraLink 6000 System and is the answer not in the manual?