Installation Steps
Site Preparation
Determine location of MCU
Run Cable for System
Run cable to Base Station locations
Terminate cable at Base Station locations
Prepare and install demarc blocks
Assign and program ports
Connect cables to demarc blocks
Install SpectraLink 6000 System
Survey site and check components
Install MCUs
Install Base Stations
Install Outdoor Base Stations
Connect and register handsets
Set up diagnostic modem
Register handsets
Program handset features
Test handsets
Site certification
PN: 1725-36096-001_J.doc
This table lists the installation steps and the person usually
responsible for each step.
Task
Description
Wire
Field
Contractor
Service
or
Engineer
Electrician
Site Preparation
Customer
Project Mgr/
Sys Admin
13