Preparing For Installation - Conair Carousel Plus D Series User Manual

With dc-c touchview technology
Table of Contents

Advertisement

P r e p a r i n g f o r I n s t a l l a t i o n
The Carousel Plus D Series Dryer is easy to install if you plan the location and prepare the
mounting area properly.
1
Make sure the mounting area provides:
r A grounded power source supplying the voltage and correct current for your
dryer model. Check the dryer's serial tag (on the control box) for the correct amps,
voltage, phase, and cycles. Field wiring should be completed by a qualified person-
nel to the planned location for the dryer. All electrical wiring should comply with
your region's electrical codes.
r A source of water, when using the aftercooler and/or precooler. The D Dryer's
aftercooler and/or precooler require tower, city, or chiller water at temperatures of
45° to 85°F {7° to 29°C}. Refer to the Specifications Sheet (page 2-7) for flow
rate for your unit. Piping should be ran to the planned dryer location. Use flexible
hose to connect the water pipes to the aftercooler and/or optional precooler.
r Minimum clearance for safe operation and maintenance. Refer to the illustra-
tions below for specific minimum clearance distance. Clearance on sides without
specified distances should be 24 inches {61 cm} minimum.
DELIVERY AIR
FILTER
DELIVERY AIR
FILTER
28.94 inches
{73.51 cm}
D600-1000 minimum clearance
19.75 inches
requirements (top view)
{50.17 cm}
D1300-2400 minimum clearance
24.38 inches
requirements (top view)
{61.93 cm}
D3200-5000 minimum clearance
DELIVERY AIR
requirements (top view)
FILTER
35.44 inches {90.02 cm}
AFTERCOOLER
DEMISTER
34.25 inches {87.00 cm}
2
TIP: If you plan to use
vacuum or compressed
air loaders to fill the
hopper, install conveying
lines to the drying hop-
per location.
0
28.25 inches
{71.76 cm}
DEMISTER
AFTERCOOLER
27.88 inches
{70.82 cm}
30.03 inches {72.28 cm}
AFTERCOOLER
DEMISTER
28.38 inches {72.09 cm}
NOTE: The aftercooler
reduces the tempera-
ture of air returning
from the drying hopper,
improving the efficiency
of the desiccant.
I n s t a l l a t i o n l
3 - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents