Reer MOSAIC M1 Installation And Use Manual page 233

Modular safety integrated controller
Hide thumbs Also See for MOSAIC M1:
Table of Contents

Advertisement

MODULAR SAFETY INTEGRATED CONTROLLER MOSAIC
Result of the simulation
The graph shows the signals relating to the simulation, in this case:
which indicates closing of the gate.
which indicates the request to start sent by the operator
have elapsed
logic level 1.
 The AND operator output signal is delayed by 2000 ms by the delay operator.
 The "Op7" retarder output signal sends the command to close the relay when
5000 ms have elapsed, at which time the "M-press" relay is activated.
Figure 101 - Graph produced by the simulation of the application example
8540780 • 10/07/2020 • Rev.38