4.87 Preliminary operation
1. Control of the IMEI label integrity
2. Remove the equipped electronic board
3. Control of any oxidation marks (on the equipped electronic board and under the metal dome)
4.88 Return procedure :
(a) The equipped electronic boards are packaged in individual electrostatic envelopes
be stocked in their original package of reception , to insure a good protection against external
attacks (see enclosed photos)
During the equipped electronic boards manipulation, gloves and electrostatic strap must be
(b)
worn at all times.
The defective equipped electronic boards have to be returned to SAGEM factory, packaged
(c)
individually, in the original package (see enclosed photos) , in the appropriate ESD box : One
box per Sagem reference (check reference written on the box).
The defective board should display the defect code written on a sticker (placed on the
(d)
shielding) and written on the ESD bag label too (printed with SMT).
Note :
On the defective boards , it is necessary to check visually under the metal dome to
discover if it shows oxidation marks. The defective boards should be returned with their
original metal dome
Boards with oxidation should not to set in conformance with the warranty
The defective boards must never be mixed with the complete mobiles
4.89 Placement procedure :
1. Take a board in the stock of swap boards from the same Sagem reference.
4.90 Further operations :
1. Place the new equipped electronic board on the assembly plate.
2. Follow stages ( see enclosed photos)
________________________________________________________________________________________________
Ref. SCT U38 SSC DTS 0023 – Index B - February 21, 2005
EQUIPPED ELECTRONIC BOARD EXCHANGE
(Proc sheet 1
03)
.(Proc sheet 1
Proc Sheet 1 15
1/3
They must
.
03)
Page 5-42

Advertisement

Table of Contents
loading

Table of Contents