Festo CPV -GE-DN2-8 Electronic Manual page 40

Cpv valve terminal with direct connection
Hide thumbs Also See for CPV -GE-DN2-8:
Table of Contents

Advertisement

1. Installation
1
Cables
2
Strain relief
3
Housing
4
Connecting part
Fig. 1/20: Individual parts of plug and cable exit
Preparing
1-26
1
4
When you have selected suitable cables connect them as
follows (Fig. 1/20):
1. In order to open the plug loosen the centre knurled nut.
2. Open the strain relief on the rear part of the housing.
Then pass the cable through.
3. Remove 5 mm of insulation from the end of the cable and
fit end sleeves on the strands.
4. Connect the ends of the conductor.
5. Replace the connecting part back onto the housing of the
plug. Pull the cable back so that there are no loops inside
the housing.
6. Tighten the strain relief.
2
3
Festo P.BE-CP-DN2-EN en 0107NH