Festo CPV -GE-DN2-8 Electronic Manual page 20

Cpv valve terminal with direct connection
Hide thumbs Also See for CPV -GE-DN2-8:
Table of Contents

Advertisement

1. Installation
1-6
Removing
1. Switch off the operating voltage.
2. Unscrew the two fastening screws of the switch module.
3. Lift up and remove the switch module.
Fitting
1. Place the switch module carefully in the recess.
2. Tighten the two fastening screws alternately.
Please note
– Do not tilt the switch module when fitting it. The fitting
position is clearly marked by a groove in the housing.
– Make sure that the seal is seated correctly.
Festo P.BE-CP-DN2-EN en 0107NH

Advertisement

Table of Contents
loading

Table of Contents