Festo CPV -GE-DN2-8 Electronic Manual page 23

Cpv valve terminal with direct connection
Hide thumbs Also See for CPV -GE-DN2-8:
Table of Contents

Advertisement

1. Installation
Extension to the CP system
CPV Direct
without extension
CPV Direct
with extension with:
– CP input module
CPV Direct
with extension with:
– a CP valve terminal
or
– a CP output module
CPV Direct
with extension with:
– a CP valve terminal/CP output module
and
– a CP input module
Fig. 1/5: Setting the extension of the CP system with the 4-position DIL switch
Festo P.BE-CP-DN2-EN en 0107NH
Setting the extension to the CP system
Further CP modules can be connected to the CPV Direct. You
can set the extension to the CP system with switch elements 3
and 4 of the 4-position DIL switch as shown in the diagram
below.
Number of inputs/outputs
16 O
16 O
16 O
+
16 O
16 O
+
16 O
Please note
Depending on the extension set, the CP system occupies
a different number of inputs and outputs or station
numbers. Further information can be found in chapter 1.6.
2
Setting of the
DIL switches
+
16 I
+
16 I
1-9

Advertisement

Table of Contents
loading

Table of Contents