Keysight Technologies M9485A Startup Manual page 26

Pxie multiport vector network analyzer
Table of Contents

Advertisement

Getting Started
STEP 3. Install the Network Analyzer Modules
Figure 1-17 Cable Connections Between Standard Modules for 24-port Configuration
Table 1-7
Part Numbers of Required Cables for Connection
No
0
1
2
3
4
5
6*
7*
9
e. Install EMC filler panels and slot blockers into empty module slots to
assure proper air circulation and operating temperatures.
Cable Part Numbers
8120-5091
M9485-61601
M9485-61602
M9485-61603
M9485-61604
M9485-61605
M9485-61606
M9485-61607
M9485-61609
Cable Type
Flexible
Flexible
Flexible
Flexible
Flexible
Flexible
Flexible
Flexible
Flexible
26
Required Tool to Place the
Cable
-
8 in-lbs Torque Wrench for
SMA (not supplied)
Cable Removal Tool,
5002-3361 is required for
removing. No tools required
for placing

Advertisement

Table of Contents
loading

This manual is also suitable for:

M9300aM9389aM9309aM9340aM9376aM9377a ... Show all

Table of Contents