Keysight Technologies M9485A Startup Manual page 22

Pxie multiport vector network analyzer
Table of Contents

Advertisement

Getting Started
STEP 3. Install the Network Analyzer Modules
Insert the SMP-SMP adapters into the receiver's input carefully as they are very sensitive
CAUTION
and the inner conductors tend to bend.
Figure 1-10 Label for Divider
Figure 1-11 Cable Removal Tool (part number 5002-3361)
Remove the 50 ohm load from output ports used on M9340A. Other unused ports should
NOTE
be terminated.
The IF Out port of the VNA receiver is terminated with 50 ohm load. This 50 ohm load can
NOTE
be used at the system power calibration.
g. Place the labels on the divider as shown in
below, on the dividers. The color in circle shows the color of the cable.
Figure 1-10 on page 22
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

M9300aM9389aM9309aM9340aM9376aM9377a ... Show all

Table of Contents