Starting / Stopping Operation by the Group
Screen 1 Monitoring
2
Screen 2 Monitoring (Group)
3
To start / stop the operation
of devices by group
Start or stop the operation of air conditioners
by group.
The example on the left shows the
1
screen for starting / stopping the
operation of Group Name : 1F North
registered for Zone Name : Canteen.
Zone Name
Canteen
1F North
1F West
1F South
1F East
2F North
2F West
2F South
4
2F East
5
3F North
[Procedure]
1.
On Screen 1 Monitoring, select a zone
from the button q.
2.
Select a zone that includes the group of
which the operation is to be started or
stopped w.
3.
Select a group from the button q.
Screen 2 Monitoring (Group) appears.
4.
Select a group to be started or stopped
as in e and press the [Start] button r
or [Stop] button t.
Air conditioner
group to be
started or
stopped
16
Need help?
Do you have a question about the intelligent touch Controller DCS601C51 and is the answer not in the manual?
Questions and answers