KidKraft Cedar Summit Timber Trail Playhouse Installation And Operating Instructions Manual page 60

Table of Contents

Advertisement

Step 21: Attach Clock Chalk Sign
A: Install Clock Chalk Signs in both side openings of the left Side Wall, reversing sides as desired. Attach from
the inside using 6 (S0) #8 x 7/8" Truss Screws per side. (fig. 21.2, 21.2)
Fig. 21.1
Clock Chalk Sign
021
Hardware
12 x
#8 x 7/8" Truss Screw
S0
60
Fig. 21.2
S0
x 6 per
clock
Clock Chalk Sign
Other Parts
2 x Clock Chalk Sign

Advertisement

Table of Contents
loading

This manual is also suitable for:

P280099

Table of Contents