KidKraft Cedar Summit Timber Trail Playhouse Installation And Operating Instructions Manual page 26

Table of Contents

Advertisement

Step 7: Attach Roof Supports
Part 2
C: On the open End Wall of (021) Panel Assembly, place a roof support assembly on each side with the (072)
Roof Supports to the insides. Make sure that support assemblies are flush to the edge of the Front and Back
Walls and attach using 2 (S4) #8 x 3" Wood Screws per side. (fig. 7.2)
D: Place (073) Counter Beam on the opposite End Wall, making sure that it's flush. Note the orientation of the
angled edge, attach using 4 (S4) #8 x 3" Wood Screws. (fig. 7.2)
E: Place a (074) Main Beam over the Front and Back Walls so that they fit between (071) Panel Beams and
(073) Counter Beam. Attach using 4 (S4) #8 x 3" Wood Screws per board. (fig. 7.2)
Fig. 7.2
073
Wood Parts
2 x
Main Beam 1" x 2" x 45 15/16"
074
1 x
Counter Beam 1" x 2" x 49 1/2"
073
x 4 per
side
S4
Flush
021
074
S4
074
071
Hardware
16 x
#8 x 3" Wood Screw
S4
26
072
S4
Flush

Advertisement

Table of Contents
loading

This manual is also suitable for:

P280099

Table of Contents