KidKraft Cedar Summit Timber Trail Playhouse Installation And Operating Instructions Manual page 17

Table of Contents

Advertisement

Step 2: Frame Assembly
Part 2
C: Place 1 (022) Side Tie along the bottom of each Side Wall so they are level and flush to the bottom of the (021)
Panel Assembly. Attach using 4 (S15) #8 x 1-3/4" Wood Screws per board. (fig. 2.3, 2.4, 2.5)
Fig. 2.4
Inside View
Flush to the bottom
Wood Parts
2 x
Side Tie 1" x 2" x 47-7/16"
022
Fig. 2.3
022
022
S15
8 x
022
Hardware
#8 x 1-3/4" Wood Screw
S15
17
021
Fig. 2.5
Top View
S15
x 4 per
side
022

Advertisement

Table of Contents
loading

This manual is also suitable for:

P280099

Table of Contents