Nortel 1000E Upgrade page 152

Option 11c chassis upgrade
Table of Contents

Advertisement

Page 152 of 228
Maintenance terminal configuration parameters
NN43041-465
Standard 01.04
Installing a Signaling Server
Procedure 20
Connecting an HP DL320-G4 Signaling Server
1
Connect the Signaling Server to the TLAN subnet. Insert the RJ-45 CAT5
(or better) cable labeled with the number 5 into the port (TLAN network
interface) on the back of the Signaling Server.
2
Connect the Signaling Server to the ELAN subnet. Insert the RJ-45 CAT5
(or better) cable labeled with the number 6 into the port (ELAN network
interface) on the back of the Signaling Server.
3
Connect a DTE–DTE null modem serial cable from the Serial Port on the
back of the Signaling Server to a maintenance terminal.
4
Connect the Signaling Server power cord.
a.
Check that the power cord is the type required in the region where
the Signaling Server is used. Do not modify or use the supplied AC
power cord if it is not the correct type.
b.
Attach the female end of the power cord to the mating AC power
receptacle on the right-hand side of the Signaling Server's back
panel. Plug the male end of the AC power cord into the AC power
source (wall outlet).
5
Configure the COM1 serial port as the communication port for the
connected maintenance terminal. Set the COM 1 baud rate for the serial
port on the Signaling Server to 9 600 b/ps. See Signaling Server:
Installation and Commissioning (NN43001-312).
6
Configure the connected maintenance terminal. See Signaling Server:
Installation and Commissioning (NN43001-312).
7
Press the Power switch.
To configure Signaling Server maintenance terminal configuration
parameters, see the Maintenance chapter of Signaling Server: Installation
and Commissioning (NN43001-312).
July 2007
End of Procedure

Advertisement

Table of Contents
loading

Table of Contents