Nortel 1000E Upgrade page 107

Option 11c chassis upgrade
Table of Contents

Advertisement

Figure 45
System reboot
Communication Server 1000E Upgrade
29 Enter <CR> or a to reboot the system (see Figure 45). Remove the CF
from the faceplate prior to reboot to ensure that the old database is not
lost.
Note: Upon sysload, small system to large system TN conversion
occurs. Please refer to Table 2 on
30 Once the reboot is complete, the final conversion takes place:
SYSLOAD HAS TAKEN PLACE CPU 0
SYSDB RLS/ISS: 450W DATE/TIME: 6/11/2006 10:01:16 RECS: 86
SEQNO: 911
DATA CONVERSION
CS 1000 RELEASE 4.50W TO CS 1000 X21 ISSUE 4.91F
CONFIG:
IDLE_SET_DISPLAY GTE
DONE
INI000 00000000 02 21 08 00000000 00000000 00000000
00000000 0 ? 00000000
31 The following TN Mapping Summary appears:
Note: Mapping summary may vary on a system by system basis
Installing the software
page
Option 11C Chassis to Communication Server 1000E
Page 107 of 228
30.