2
Installation as function module F24
2.5.3
Pin allocation of the fieldbus interface
Bus connection
Socket
Pin
1
2
3
4
5
6
7
8
9
Housing
Tab. 2.15 Pin allocation fieldbus connection
2.5.4
Connecting the fieldbus
Connection assignment
4
1
CC-Link master (master module)
2
Intended CC-Link cable
3
CC-Link slave (Remote Device Station)
1) The three cables for connection to BDA, CM and DG are twisted.
Fig. 2.4
Connection assignment of CC-Link
28
CC-LINK
Designation
n.c.
free (not connected)
DA
Data A
DG
Data reference potential (data ground)
n.c.
free (not connected)
n.c.
FE via R/C comb. (free)
n.c.
free (not connected)
DB
Data B
n.c.
free (not connected)
n.c.
free (not connected)
SLD / FG
Cable screening/shield, connection to FE of the CPX terminal
1
2
DA
DB
DG
SLD
FG
1)
3
2
DA
DB
DG
SLD
FG
5
4
Terminating resistor
5
Earthing (SLD and FG connected in the
module)
Festo – P.BE-CPX-FB23-24-EN – 1305a – English
3
DA
DB
DG
SLD
FG
4