Progress Bar While Collecting Data - Texas Instruments MSOP-8EVM-PDK User Manual

Hide thumbs Also See for MSOP-8EVM-PDK:
Table of Contents

Advertisement

Evaluating with the ADCPro Software
7.1.4
Collecting Data
Once you have configured the ADSXXXXEVM device for your test scenario, pressing the ADCPro Acquire
button starts the collection of the number of data points specified in the Test plug-in Block Size control.
The ADSXXXXEVM-PDK plug-in disables all the front panel controls while acquiring and displays a
progress bar, as shown in
For more information on testing ADCs in general and using ADCPro and Test plug-ins, refer to the
ACDPro User's
Guide.
7.2
Troubleshooting
If ADCPro stops responding while the ADSXXXXEVM-PDK is connected, unplug the power supply from
the PDK. Unload and reload the plug-in before reapplying power to the PDK.
20
MSOP-8EVM and MSOP-8EVM-PDK
Figure
17.
Figure 17. Progress Bar While Collecting Data
Copyright © 2008–2016, Texas Instruments Incorporated
SBAU140A – December 2008 – Revised February 2016
Submit Documentation Feedback
www.ti.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MSOP-8EVM-PDK and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Msop-8evm

Table of Contents