Checking Pvc Connections - Paradyne FrameSaver SLV 9128 Installation Instructions Manual

1-slot unit
Hide thumbs Also See for FrameSaver SLV 9128:
Table of Contents

Advertisement

Checking PVC Connections

Check PVC connections to verify that all PVCs, including management PVCs, are
configured, and to see whether the PVC is active or not.
1. Press Esc to return to the Status menu.
2. Select PVC Connection Status.
The PVC Connection Status screen shows all PVC connections; the interface and
DLCI number of the source interface and DLCI number for the destination
interface. You can also see whether the PVC is active.
3. Verify that each PVC is active.
– If active, the FrameSaver unit should be passing data.
– If not active, no data traffic can be carried by the PVC. If the PVC is configured
correctly, the circuit may be down.
Verifying That Data Can Be Passed Between DBMs
1. Select Test, then ISDN Call/PVC Tests
Main Menu
2. Select the link to be tested.
3. Start a Test Call. The Status should be Active.
4. Wait as the originating DBM places the backup call.
The originating unit's Test LED is on.
If the Result is . . .
Frame Relay Link Up
Frame Relay Link
Suboptimal
Frame Relay Link Down
5. Select Stop to end the Test Call.
See Verifying Backup Setup in Configuration of the User's Guide for additional
information.
Test
ISDN Call/PVC Tests
Then . . .
The call was successful.
Not all links have come up. Verify that the Maximum
Link Rate (Kbps) setting in the ISDN Link Profile is
the same at both ends.
The call was unsuccessful. Verify the configuration
and Link Status in the ISDN Link Profile.
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9128-ii

Table of Contents