Paradyne FrameSaver SLV 9128 Installation Instructions Manual page 19

1-slot unit
Hide thumbs Also See for FrameSaver SLV 9128:
Table of Contents

Advertisement

Connecting to the DSX
1. Connect the DB15 end of the DSX cable to the DSX-1 interface.
2. Connect the other end of the cable to the CPE (customer premises equipment,
like a PBX).
3. Tighten the screws on each side of the connector to secure the cable.
P
O
R
T
1
POWER
4. Verify that the DSX signal (SIG) LED is green, and that the DSX out-of-frame
(OOF) and alarm (ALM) LEDs are off. If so, the DSX interface is set up correctly
and is operational. If not, make sure both ends of the DSX cable are properly
seated.
When ALM is on, contact the service provider.
5. Check Health and Status messages in the left column of the System and Test
Status screen.
Main Menu
If any DSX-1 messages appear, refer to the status information in Operation and
Maintenance of the User's Guide.
P
O
R
T
2
MODEM
COM
DSX
Status
System and Test Status
DBM
NET
ENET
19
PBX
00-16844

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9128-ii

Table of Contents