Paradyne FrameSaver SLV 9580 T3 ATM DSU Installation Instructions Manual

Advertisement

Quick Links

r
FrameSaver
SLV 9580 T3 ATM DSU
Installation Instructions
Document Number 9580-A2-GZ40-10
June 1999
Installation Checklist
9580-A2-GZ40-10
TM
Installation of the FrameSaver SLV 9580 DSU requires the following steps:
- Verify the contents of the shipping carton
- Mount the DSU in a cabinet or on open rails
- Connect the DSU to a power source
- Monitor the power-up self-test
- Connect the DSU to its DS3 interface
- Connect the DSU to its DTEs
- Connect the DSU to an Ethernet interface
- Connect the DSU to a terminal or PC, directly or through a modem
- Enter a device profile
- Set up system Login IDs and access levels
- Configure the system
— Configure management PVCs and any other unique PVCs
— Enter and configure VPI/VCIs if your switch does not support traffic
descriptors
— Configure and run Auto-Configuration
- Connect the DSU to its monitor and NetScout Probe, if used
- Test the system
At any step, diagnose and correct any errors.
Physical installation is described in this document. For detailed configuration and
troubleshooting information, see the FrameSaver SLV 9580 T3 ATM DSU User's
Guide (9580-A2-GB20).
June 1999
1

Advertisement

Table of Contents
loading

Summary of Contents for Paradyne FrameSaver SLV 9580 T3 ATM DSU

  • Page 1 - Connect the DSU to its monitor and NetScout Probe, if used - Test the system At any step, diagnose and correct any errors. Physical installation is described in this document. For detailed configuration and troubleshooting information, see the FrameSaver SLV 9580 T3 ATM DSU User’s Guide (9580-A2-GB20). 9580-A2-GZ40-10 June 1999...
  • Page 2: Checking The Contents Of The Shipping Carton

    Checking the Contents of the Shipping Carton The shipping carton for your FrameSaver SLV 9580 DSU should contain: FrameSaver SLV 9580 DSU Two DS3 network cables One power cable for each power supply installed Two mounting brackets Installation kit containing machine screws and other hardware Installation instructions User’s guide Notify your supplier if anything is missing or damaged.
  • Page 3 " Procedure To install the FrameSaver SLV 9580 DSU in a standard rack: 1. Determine the general position of the FrameSaver SLV 9580 DSU in the rack. Hold one of the mounting brackets in that position and align it so that the notches in the keyed holes of the bracket line up precisely with holes in the rail.
  • Page 4 5. Determine the size of the rack you are installing the DSU in. The brackets must be mounted with the: — Wide side of the brackets against the body of the DSU for a 19-inch rack — Narrow side of the brackets against the body of the DSU for a 23-inch rack Use the screw holes: —...
  • Page 5 7. Lift the FrameSaver SLV 9580 DSU into position in the rack, putting the screws through the keyed holes of the bracket. Lower the DSU onto the screws. 98-16024 8. Put a machine screw through the top hole of each bracket and tighten the screw.
  • Page 6: Connecting To Power

    Connecting to Power The FrameSaver SLV 9580 DSU can be powered by one or two power modules. Each is supplied with a power cable. " Procedure To install the power cable: 1. Verify that the switch on the power module is in the Off (0) position. 2.
  • Page 7: Power-On Self-Test

    Power-On Self-Test When power is applied to the FrameSaver SLV 9580 DSU, it performs a series of internal tests. The SYSTEM TST and SYSTEM OK LEDs are on during the power-on self-test. When the test is complete, all LEDs light up for about five seconds, then assume their assigned functions.
  • Page 8 Connecting the DS3 Network Cables Connection to the DS3 network requires two BNC-to-BNC coaxial cables. The cables are shipped with the FrameSaver SLV 9580 DSU. " Procedure To install the DS3 network cables: 1. Take the end of the receive cable and push it onto the DS3 RX (Receive) connector on the back of the FrameSaver SLV 9580 DSU.
  • Page 9 Connecting the DTE Cables The FrameSaver SLV 9580 DSU can be connected to two DTEs. Each may have either a HSSI or a V.35 interface. The FrameSaver SLV 9580 DSU automatically detects the presence of a V.35 adapter. If Port Type is set to HSSI and a V.35 adapter is installed, or if Port Type is V.35 and a V.35 adapter is not installed, an error message is displayed on the Health and Status screen and the Port- n Physical Options configuration screen.
  • Page 10: Connecting The Lan Cable

    Connecting the LAN Cable The LAN port can be connected to an Ethernet hub using a standard 10BaseT cable, or to a Network Interface Card (NIC) in a PC using a crossover cable. The LAN port provides a high-speed connection that can be used for FTP and Telnet sessions.
  • Page 11: Connecting The Terminal Cable

    Connecting the Terminal Cable The Terminal port on the back of the FrameSaver SLV 9580 DSU can be used to connect a VT100-compatible terminal, a PC with terminal emulation software, or a modem. The port can be protected by access level or password. Dial-in access is disabled by default.
  • Page 12 Main Test Status System and Port-1 DLCI Port-2 DLCI VPI/VCI Performance Display Identify Test Status Circuit Details Circuit Details Circuit Details Connection Statistics LEDs Status Interface Network Network Network Port 1 Port 1 Port 1 Port 2 Port 2 Port 2 Traffic DS3 Line Physical...
  • Page 13 Configuration Configuration Control Shortcuts Device Date & Reset Administer IP Routing Reset Profile Time Behavior Login Table Device Configuration Edit/Display Service Network Data Test User Management Level Interface Ports Connections Interface Verification Communication Port-1 Terminal Node IP Physical Connection Port Config.
  • Page 14 Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î main/control/device_name PARADYNE 9580 Device Name: Node A 05/13/2000 00:01 Î...
  • Page 15: Configure The Unit

    " Procedure To load a configuration option set into the configuration edit area: 1. Follow this menu selection sequence: Main Menu Configuration main/config_load PARADYNE 9580 Device Name: Node A 05/13/2000 00:02 LOAD CONFIGURATION FROM: Current Configuration Default Factory Configuration Î...
  • Page 16 Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î main/config PARADYNE 9580 Device Name: Node A 05/13/2000 00:03 Î...
  • Page 17 Auto-Configuration Shortcuts Auto-Configuration defines Permanent Virtual Circuits (PVCs) for the Virtual Channel Connections (VCCs) that you have defined or that exist on the network, according to parameters you specify. A VCC is identified by a Virtual Path Identifier/Virtual Channel Identifier (VPI/VCI). A frame relay virtual circuit is identified by a Data Link Control Identifier (DLCI).
  • Page 18: Test The System

    If Test Timeout is enabled, user-initiated loopback and pattern tests end after the number of minutes specified in Test Duration. If Test Timeout is disabled, tests run indefinitely. *9580-A2-GZ40-10* *9580–A2–GZ40–10* Copyright E 1999 Paradyne Corporation June 1999 9580-A2-GZ40-10...

Table of Contents