Paradyne FrameSaver SLV 9128 Installation Instructions Manual page 8

1-slot unit
Hide thumbs Also See for FrameSaver SLV 9128:
Table of Contents

Advertisement

The remaining steps are optional, depending upon the application. They are performed
from the Main Menu.
9. If the unit will be enforcing CIR (Committed Information Rate) and EIR (Excess
Information Rate) on network frame relay links, enable Traffic Policing.
Main Menu
You can change other Frame Relay and LMI default settings, if necessary.
10. Configure each interface according to the local management interface (LMI ) and
assigned line conditions supplied by the service provider.
Configuration
Configuration
11. Set up SNMP local management (see Setting Up Local Management at the Central
Site on page 12).
12. Set up the modem, and the Call Directories if trap dial-out is desired (see Setting
Up the Modem on page 13).
13. If the unit is equipped with an ISDN DBM, set up the DBM (see Setting Up the
ISDN DBM on page 14).
14. If SNMP traps are wanted, set up managers, select the desired traps, and
configure trap dial-out if desired (see Configuring SNMP Trap Managers and Trap
Dial-Out on page 16).
15. Save the configurations.
16. Verify the entire path from the remote unit to the NMS is functioning (see Verifying
the End-to-End Path on page 18).
17. If the DSX-1 interface will be used, install the DSX-1 cable (see Connecting to the
DSX on page 19). Time slots for the DSX-1 interface will need to be assigned to
the network interface (see Assigning DSX-1 Time Slots to the Network Interface in
Configuration of the User's Guide).
18. Install the DTE cables (see Connecting to the DTE (Router or FRAD) on page 20).
19. Install the modem cable (see Connecting the Modem on page 21).
20. If the unit is equipped with an ISDN DBM, install the ISDN DBM cable (see
Connecting the ISDN on page 22).
21. If the FrameSaver SLV 9128-II will use its Ethernet port for management, install
the Ethernet cable (see Connecting to the Ethernet on page 23).
22. Verify that data is being received (see Verifying That Data is Being Received on
page 23).
23. Verify that all PVCs, including Management PVCs, are configured; and see
whether the PVC is active or not (see Checking PVC Connections on page 24).
24. Verify the setup for backup, if applicable (see Verifying that Data Can Be Passed
Between DBMs on page 24).
The FrameSaver installation is complete.
Configuration
System
Network
Frame Relay
Data Ports
Frame Relay
Frame Relay and LMI
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9128-ii

Table of Contents