Paradyne FrameServer SLV 9520-ILM Installation Instructions Manual

Hide thumbs Also See for FrameServer SLV 9520-ILM:

Advertisement

Quick Links

®
FrameSaver
SLV 9520-ILM
Installation Instructions
Document Number 9520-A2-GN11-10
January 2003
Contents
Product Documentation Online ..................................................................... 2
Checking the Contents of the Shipping Carton ............................................. 2
Site Preparation Checklist ............................................................................. 3
Installing the FrameSaver SLV 9520-ILM ...................................................... 3
Cables Required ........................................................................................... 4
Mounting the FrameSaver SLV 9520-ILM ..................................................... 5
Connecting to Power ..................................................................................... 7
Connecting the Terminal Cable ..................................................................... 8
Menu Hierarchy ............................................................................................. 9
Power-On Self-Test ....................................................................................... 12
Configuration Using Configuration Edit/Display ............................................ 12
About the Installation Procedures ................................................................. 13
Minimal Installation ....................................................................................... 14
Full Installation and Setup ............................................................................ 16
Automatic Configuration ................................................................................ 17
Connecting to the Network ........................................................................... 17
Configuring SNMP Trap Managers and Traps .............................................. 19
Verifying the End-to-End Path ....................................................................... 19
Connecting the LAN Cable ........................................................................... 20
Connecting to the DTE ................................................................................. 20
Checking that Data is Being Received .......................................................... 22
Checking PVC Connections .......................................................................... 22
Important Safety Instructions ....................................................................... 23
Government Requirements ........................................................................... 25
Warranty, Sales, Service, and Training Information ...................................... 27
Document Feedback ..................................................................................... 27
Trademarks ................................................................................................... 27
Patent Notification ......................................................................................... 27
1

Advertisement

Table of Contents
loading

Summary of Contents for Paradyne FrameServer SLV 9520-ILM

  • Page 1: Table Of Contents

    ® FrameSaver SLV 9520-ILM Installation Instructions Document Number 9520-A2-GN11-10 January 2003 Contents Product Documentation Online ..............2 Checking the Contents of the Shipping Carton ..........2 Site Preparation Checklist ................3 Installing the FrameSaver SLV 9520-ILM ............3 Cables Required ................... 4 Mounting the FrameSaver SLV 9520-ILM .............
  • Page 2: Product Documentation Online

    FrameSaver SLV Configuration Reference (9000-A2-GB31) FrameSaver SLV SNMP Reference (9000-A2-GB32) FrameSaver SLV Operations Guide (9000-A2-GB33) To order a paper copy of a Paradyne document, or to speak with a sales representative, please call 1-727-530-2000. Be sure to register your warranty at www.paradyne.com/warranty.
  • Page 3: Site Preparation Checklist

    Site Preparation Checklist Preparation for installation of the FrameSaver SLV 9520-ILM includes the following steps: ❑ Identify a suitable location for installation: — Verify that there is a nearby unshared ac power source, preferably from an Uninterruptable Power Supply (UPS). If a redundant power supply is used, verify that there is a second source available.
  • Page 4: Cables Required

    Cables Required Table 1, Cables Required, shows the cables used with the FrameSaver SLV 9520-ILM. See the FrameSaver SLV Technical Description (9000-A2-GB30) for electrical specifications of the cables. Table 1. Cables Required Port Cable Description Quantity Required Supplied NET RX, BNC to BNC coaxial Four NET TX...
  • Page 5: Mounting The Framesaver Slv 9520-Ilm

    Mounting the FrameSaver SLV 9520-ILM The FrameSaver SLV 9520-ILM can be mounted in a standard 19-inch (483 mm) or 23-inch (584 mm) cabinet or open rails, and either flush with the mounting rails or approximately 4 inches (100 mm) forward of the rails. The different configurations are accommodated by positioning two mounting brackets.
  • Page 6 5. Determine the size of the rack in which you are installing the unit. The brackets must be mounted with the: 19-inch Rack Flush Mount — Wide side of the brackets A IS against the body of the unit for a 19-inch (483 mm) rack —...
  • Page 7: Connecting To Power

    Connecting to Power The FrameSaver SLV 9520-ILM is powered by redundant power modules. Each is supplied with a power cable. Procedure To install the power cable: 1. Verify that the switch on the power module is in the Off (0) position. 2.
  • Page 8: Connecting The Terminal Cable

    Connecting the Terminal Cable The TERMINAL PORT on the back of the FrameSaver SLV 9520-ILM can be used to connect a VT100-compatible terminal or a PC with terminal emulation software. The FrameSaver SLV port can be protected by access level or password. See the Configuration Reference (9000-A2-GB31) for more information.
  • Page 9: Menu Hierarchy

    Menu Hierarchy The Menu Hierarchy shows the organization of the FrameSaver unit’s screens. Status System and Test Self-Test Results Status Last System Reset Health and Status Test Status LMI Reported DLCI DLCIs Status CIR (bps) IP Path Device Name Connection Status IP Address Status Discovery Source...
  • Page 10 Test Network PVC PVC Loopback Tests Send Pattern Monitor Pattern Connectivity T3 User Port PVC PVC Loopback Tests Send Pattern Monitor Pattern Connectivity Network Physical Local Line Loopback Tests T3 User Port Line Loopback Physical Tests IP Ping Lamp Test Abort All Tests Configuration System...
  • Page 11 Control Modem Call Directory Number Directories Directory Phone Number System Device Name Information System Name, Location, Contact Date Time Administer Logins Login ID Password Access Level Change Operating Back-to-Back Mode Mode Standard Mode Select Software Current Release Release Alternate Release Switch &...
  • Page 12: Power-On Self-Test

    Power-On Self-Test When power is applied to the FrameSaver SLV 9520-ILM, it performs a series of internal tests. The SYSTEM TST and SYSTEM OK LEDs are on during the power-on self-test. When the test is complete, all LEDs light up for about five seconds, then assume their assigned functions.
  • Page 13: About The Installation Procedures

    As an example, follow these steps to go to the Configuration Edit/Display menu so you can start setting up the unit. Procedure To load a configuration for editing: 1. From the Main Menu, press the down arrow key twice so the cursor is on Configuration.
  • Page 14: Minimal Installation

    Minimal Installation A minimal configuration can be performed using the Easy Install screen. Once the unit is installed and minimal configuration is completed, the NOC can complete and verify the setup. Procedure 1. Select the Easy Install feature. Main Menu Easy Install main/easy_install 9520-ILM...
  • Page 15 5. If the network cable length is longer than 100 ft (30 m), set the Network 1 Line Build Out to Long. 6. If the DTE cable length is longer than 100 ft (30 m), set the Port 1 Line Build Out to Long.
  • Page 16: Full Installation And Setup

    Full Installation and Setup The Easy Install feature can also be used when one person installs and sets up the FrameSaver unit from beginning to end. Procedure 1. Follow Step 1 through Step 8 of Minimal Installation on page 14. 2.
  • Page 17: Automatic Configuration

    Automatic Configuration The FrameSaver unit provides several automatic configuration features. Frame Relay Discovery and configuration is one of these features. Main Menu Auto-Configuration The default discovery mode is 1MPort. In this mode, for each DLCI discovered on the network, a multiplexed network DLCI and a standard data port DLCI will be configured and connected, and a Management PVC will be embedded in the network DLCI.
  • Page 18 Net RX Net TX Network Interface 00-16778 5. If the DS3 source device has a variable line build out (LBO) setting, ensure that it is matched to the cable length. NOTE: After connecting the network cable, wait about a minute to allow Auto- Configuration a chance to discover the frame relay characteristics and DLCIs.
  • Page 19: Configuring Snmp Trap Managers And Traps

    Configuring SNMP Trap Managers and Traps Once the FrameSaver unit is connected to the network, SNMP trap managers and SNMP traps can be configured. Procedure To enter SNMP managers and configure traps: 1. Select SNMP Traps. Main Menu Configuration Management and Communication SNMP Traps 2.
  • Page 20: Connecting The Lan Cable

    Connecting the LAN Cable The LAN port can be connected to an Ethernet hub using a standard 10BaseT cable, or to a Network Interface Card (NIC) in a PC using a crossover cable. The LAN port provides a high-speed connection that can be used for FTP and Telnet sessions. Procedure To connect the FrameSaver SLV 9520-ILM to an Ethernet hub or NIC: 1.
  • Page 21 3. Take the end of the transmit cable and push it on to the CPE TX connector on the back of the unit. Turn the cable connector clockwise to lock it. 4. Connect the other end of the transmit cable to the receive port of the CPE DTE. 5.
  • Page 22: Checking That Data Is Being Received

    Checking that Data is Being Received Procedure 1. Return to the Main Menu. 2. Select Performance Statistics, and select an interface’s frame relay statistics. Main Menu Status Performance Statistics Frame Relay Net1-FR1 3. Verify that the Frames Received and Characters Received counts under the Frame Relay Link statistics are incrementing, and there are no errors under the Frame Relay LMI statistics.
  • Page 23: Important Safety Instructions

    Important Safety Instructions 1. Read and follow all warning notices and instructions marked on the product or included in the manual. 2. This product is intended to be used with a 3-wire grounding type plug – a plug which has a grounding pin. This is a safety feature. Equipment grounding is vital to ensure safe operation.
  • Page 24 The authority to operate this equipment is conditioned by the requirements that no modifications will be made to the equipment unless the changes or modifications are expressly approved by Paradyne. CANADA – EMI NOTICE: This Class A digital apparatus meets all requirements of the Canadian interference-causing equipment regulations.
  • Page 25: Government Requirements

    Government Requirements Certain governments require that instructions pertaining to connection to the telephone network be included in the user documentation. Specific instructions listed in the following sections pertain to the unit’s modem, Model 9008-F1-100. United States Notice to Users of the Telephone Network This equipment complies with Part 68 of the FCC rules.
  • Page 26 Canada Notice to Users of the Canadian Telephone Network The Industry Canada label identifies certified equipment. This certification means that the equipment meets telecommunications network protective, operational and safety requirements as prescribed in the appropriate Terminal Equipment Technical Requirements document(s). The Department does not guarantee the equipment will operate to the user’s satisfaction.
  • Page 27: Warranty, Sales, Service, And Training Information

    Document Feedback We welcome your comments and suggestions about this document. Please mail them to Technical Publications, Paradyne Corporation, 8545 126th Ave. N., Largo, FL 33773, or send e-mail to userdoc@paradyne.com. Include the number and title of this document in your correspondence. Please include your name and phone number if you are willing to provide additional clarification.
  • Page 28 *9520-A2-GN11-10* *9520-A2-GN11-10*...

Table of Contents