Installation.wiring - Assa Abloy Sargent v.S1 Profile Installation Instructions Manual

Poe cylindrical lock
Hide thumbs Also See for Sargent v.S1 Profile:
Table of Contents

Advertisement

Installation Wiring
6
A
PoE frame harness assembly (From McKinney)
B
PoE data hinge (Patent Pending) (From McKinney)
C
PoE door harness* (From McKinney)
Supplied.by.CI
B-Splice
.Crimp.Connector
RJ45-M
Ceiling
24AWG
Stranded
Wire for
Earth
Ground
inside
15' Frame
Harness
Frame-Side
Harness
Assembly
(15' length)
Cable
drain wire
concealed
Molex-M
Molex-F
in shrink
tubing
A
4
A7763B
Certified Integrator (CI) supplies and terminates
the B-Splice connector and the
Male RJ45 connector from harness to
end user provided facility cable
Drain.Wire
RJ45-F Jack
Cable: CAT 5e or higher
24 AWG shielded with drain wire
Cable
: CAT 5e,
26 AWG stranded,
shielded, 100ohm
Molex-F Molex-M
B
C
Ring Terminal
Secured to Lock
Mounting Plate
Wiring.to.TIA-568-B.Standard
Profile Series v.S1 PoE Cylindrical Lock
D
DPS: Door Position Switch (cylindrical and exits only)
E
Profile Series v.S1 PoE lock
* Order of installation may vary.
Refer to appropriate sections for instructions.
Patch Cable:
Patch Panel to
PoE Switch
E
PoE.
Lock
4-Pin
D
4-Pin
Ground
Supplied.by.End.User
PoE Switch
Patch Panel
Drain Wire Terminated on Rack
Approved.Software
Notes:
Connectors go on only one
way. They cannot be placed
in an incorrect position.
Do not force and do not
offset connectors.
Be sure they are completely
seated (flush).
PoE Switch is
terminated to
Earth ground

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents